PERENCANAAN DAYA BATERAI 110V DC DAN 48V DC PADA GARDU INDUK 150 KV PANGKAL PINANG 2 DI PT PLN (PERSERO)

Andri, Roby (2021) PERENCANAAN DAYA BATERAI 110V DC DAN 48V DC PADA GARDU INDUK 150 KV PANGKAL PINANG 2 DI PT PLN (PERSERO). S-1 thesis, 021008 Universitas Tridinanti Palembang.

[img] Text (BAB I)
BAB I Full.pdf - Published Version

Download (1MB)
[img] Text (BAB II)
BAB II.pdf - Published Version
Restricted to Repository staff only

Download (918kB) | Request a copy
[img] Text (BAB III)
BAB III.pdf - Published Version
Restricted to Repository staff only

Download (693kB) | Request a copy
[img] Text (BAB IV)
BAB IV.pdf - Published Version
Restricted to Repository staff only

Download (458kB) | Request a copy
[img] Text (BAB V)
BAB V.pdf - Published Version
Restricted to Repository staff only

Download (354kB) | Request a copy

Abstract

ROBY ANDRI "PERENCANAAN DAYA BATERAI 110V DC DAN 48V DC PADA GARDU INDUK 150 KV PANGKAL PINANG 2 DI PT PLN (PERSERO)", Dibawah Bimbingan Bapak Ir. H. Ishak Effendi, MT. dan BAPAK M. Husni Syahbani, ST., MT. Penlitian ini bertujuan untuk mengetahui kapasitas minimal dan maksimal baterai 110V DC dan 48V DC untuk Gardu Induk 150 kV Pangkal Pinang 2 serta mengatahui jumlah sel baterai 110V DC dan 48V DC untuk Gardu Induk 150 kV Pangkal Pinang 2.

Item Type: Thesis (S-1)
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > S1 Teknik Elektro
Depositing User: Roby Andri
Date Deposited: 15 Oct 2021 03:07
Last Modified: 15 Oct 2021 03:07
URI: http://repository.univ-tridinanti.ac.id/id/eprint/3467

Actions (login required)

View Item View Item