SANTOSO, MUHAMMAD FIKRI (2022) ANALISA ALIRAN DAYA SISTEM TENAGA LISTRIK PT.PERTAMINA RU III PLAJU. S-1 thesis, 021008 UNIVERSITAS TRIDINANTI.
Text (Bab I)
bab 1.pdf - Published Version Download (1MB) |
|
Text (BAB II)
BAB II -FIKRI-2.pdf - Published Version Restricted to Repository staff only Download (561kB) | Request a copy |
|
Text (BAB III)
BAB III -FIKRI-2.pdf - Published Version Restricted to Repository staff only Download (358kB) | Request a copy |
|
Text (BAB IV)
BAB IV - FIKRI.pdf - Published Version Restricted to Repository staff only Download (676kB) | Request a copy |
|
Text (BAB V)
BAB V -FIKRI.pdf - Published Version Restricted to Repository staff only Download (150kB) | Request a copy |
Abstract
ABSTRACT Pertamina RU III has its own electricity system network with the use of 12 kV. The electricity network itself is expected to be able to supply the load on the Pertamina RU III electricity unit. The initially good configuration design may not match the current situation. If there is a disturbance such as short circuit current, it causes damage to electrical equipment and experiences an imbalance. For this reason, it is necessary to conduct a Short Circuit Current Study as well as to evaluate future planning if there will be an innovation to add a load. kA and the maximum current is 42.92 kA and it can be concluded that the Cb installed on bus 5 for Transformer 12 is still feasible to use. Keywords: Short circuit current, Electric power system, Stage 12.6.0
Item Type: | Thesis (S-1) |
---|---|
Subjects: | H Social Sciences > HC Economic History and Conditions H Social Sciences > HD Industries. Land use. Labor H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management |
Divisions: | Fakultas Teknik > S1 Teknik Elektro |
Depositing User: | Fikri aiki Fikri naswan |
Date Deposited: | 21 Nov 2023 04:39 |
Last Modified: | 21 Nov 2023 04:39 |
URI: | http://repository.univ-tridinanti.ac.id/id/eprint/7121 |
Actions (login required)
View Item |