Up a level |
Aprianto, Agung (2024) PENERAPAN WORKLOAD ANALYSIS UNTUK OPTIMALISASI KEBUTUHAN TENAGA KERJA MENGGUNAKAN METODE FTE (FULL TIME EQUIVALENT). S-1 thesis, 021008 Universitas Tridinanti Palembang.
GHAFAR, MUHAMMAD SANDY (2024) PEMILIHAN PEMASARAN PRODUK INDUSTRI MIKRO DAN KECIL BERBASIS ONLINE. S-1 thesis, 021008 Universitas Tridinanti.
RAMARDI, GILANG (2024) OPTIMASI PENGENDALIAN DAN PENJADWALAN PERSEDIAAN BARANG DAGANG (Studi Kasus PT Berlian Tiga Cakra). S-1 thesis, 021008 Universitas Tridinanti.
SIMANJUNTAK, ANDRE PARLINDUNGAN (2024) EVALUASI WASTE PADA LEAD TIME PROSES OUTBOUND PELUMAS KEMASAN BOX DENGAN MENGGUNAKAN METODE VALUE STREAM MAPPING (VSM) (STUDI KASUS PT PERTAMINA LUBRICANTS DSP KERTAPATI). S-1 thesis, 021008 Universitas Tridinanti.
Weldi Ravindo, Muhammad (2024) PERANCANGAN TATA LETAK GUDANG MENGGUNAKAN METODE CLASS BASED STORAGE PADA WAREHOUSE PT. BERLIAN TIGA CAKRA PALEMBANG. S-1 thesis, 021008 Universitas Tridinanti Palembang.